Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting To The Internal Distribution Box - Bosch BPT-S Hybrid Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

80 | Installation
Storage system | Installation manual
6.20:
Install the string inverter and tighten the screws
The string inverter is fitted.
6.9.2

Connecting to the internal distribution box

Info
Observe the maximum tightening torque when
connecting the cables (Tightening torques overview,
p. 139)
Procedure
1. Connect the 2-core backup cable (1) to the upper
terminals 5 and 6 on the internal distribution box
2. Connect the 4-core intermediate circuit cable (DC
link) (2) to the upper terminals 1-4 on the internal
distribution box
English
Bosch Power Tec GmbH

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis