Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch BPT-S Hybrid Installationsanleitung Seite 222

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

78 | Installation
Storage system | Installation manual
(1)
(2)
Backup line out (1) and intermediate circuit cable
6.18:
(DC Link) (2) terminals on the battery converter
6.19:
Internal distribution box: 4-core cable to terminals
1-4; 2-core cable to terminals 5-6
Info
The copper foil on the cables must be visible in equal
amounts on the feeds at the top and bottom
(important for EMC protection).
4. Tighten the EMC screw connection
The battery converter is connected to the internal
distribution box.
1
2
3
4
5
6
1
2
3 4 5
6
English
(2)
Bosch Power Tec GmbH

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis