Herunterladen Diese Seite drucken

STIEBEL ELTRON OTE 3 Bedienungsanleitung Seite 30

Vorschau ausblenden Andere Handbücher für OTE 3:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

OPERATION
Settings
f On the start screen, press the selection button.
f Open the menu.
Menu
DHW circuit / Operation mode / Operation mode domestic hot water
f Change the operating mode by turning the selection
button.
f Confirm the required operating mode by pressing the se-
lection button.
f Return to the start screen by pressing the ESC button a
number of times.
5.11 Setting heat pump operating mode
Operating mode
Description
0: Off
The heat pump is switched off. If there is a heat
demand, the next heat generator (e.g. electric
auxiliary heater) is requested.
You should not switch the heat pump off except
in an emergency.
1: Automatic
The heat pump operates in automatic mode.
The heat pump is switched on and off automati-
cally according to the heat demand.
f On the start screen, press the selection button.
f Open the menu.
Menu
Heat pump  / Operation mode  / Operation mode heat pump
f Change the operating mode by turning the selection
button.
f Confirm the required operating mode by pressing the se-
lection button.
f Return to the start screen by pressing the ESC button a
number of times.
5.12 Setting the emergency/auxiliary heater
operating mode
Operating mode
Description
0: Off
Auxiliary heater OFF.
The auxiliary heater is unavailable for backup
heating (except for frost protection /defrost back-
up)
1: Automatic
The auxiliary heater operates in automatic mode.
It is switched on and off automatically according
to the heat demand.
4: Manual mode heat-
Auxiliary heater heats according to a fixed set
ing
flow temperature (09-020). Please note: This set-
ting can lead to higher heating costs and should
only be used briefly for commissioning /test
purposes.
An emergency/auxiliary heater (electric heater, oil/gas boiler)
can be integrated into the heating system.
f On the start screen, press the selection button.
f Open the menu.
Menu
Auxiliary heating  / Operation mode  / Operation mode heat generator
f Change the operating mode by turning the selection
button.
f Confirm the required operating mode by pressing the se-
lection button.
30 |
f Return to the start screen by pressing the ESC button a
number of times.
5.13 Setting date and time
Notice
The system changes automatically to wintertime on
the last Sunday in October. The system changes auto-
matically to summertime on the last Sunday in March.
If a touchscreen programming unit with internet con-
nection (available as an accessory) is installed, the time
of day can be updated from a time server.
f On the start screen, press the selection button.
f Open the menu.
Menu
Service Report  / Settings  / Time
Service Report  / Settings  / Date
f Set the correct value by turning the selection button.
f Save the settings by pressing the selection button.
f Return to the start screen by pressing the ESC button a
number of times.
5.14 Setting master data
You can set master data (text) on the control unit.
- Name of plant operator
- Name of installer
- Name of planner [design engineer]
f On the start screen, press the selection button.
f Open the menu.
Menu
Service Report  / Master data / Plant operator
Service Report  / Master data  / Installer
Service Report  / Master data  / Planner [design engineer]
f Turn the selection button to the left until the "<" character
appears next to the text.
f Delete letters and numbers by pressing the selection
button.
f Select letters and numbers by turning the selection but-
ton clockwise.
f Confirm the character by pressing the selection button.
f Repeat until the required text is shown on the display.
f Press the ESC button.
f Save the settings by pressing the selection button.
f Return to the start screen by pressing the ESC button a
number of times.
5.15 Heat-up program
Only one heating circuit can be started for screed drying on
each controller. The screed drying process uses a ramping
function with rising and falling flow temperatures.
1. Start of the screed drying program
The heating circuit pump is switched on when the system is
started up. After 5 minutes, the flow temperature is measured.
OTE

Werbung

loading

Verwandte Produkte für STIEBEL ELTRON OTE 3