Herunterladen Diese Seite drucken

Nibe VVM S325 Installateurhandbuch Seite 64

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

System diagram
NOTE
This is an outline diagram. Actual installations
must be planned according to applicable
standards.
EXPLANATION
CL11
Pool system
AA25
AXC module
BT51
Temperature sensor, pool
EP5
Heat exchanger, pool
GP9
Circulation pump, pool
GP12
Charge pump, pool
HQ4
Particle filter
QN19
Three way valve, pool
EB15
VVM 225/VVM 310/VVM 320/VVM 325
EB101
F2120/F2040/AMS10/HBS05
Miscel-
laneous
BT25
External supply temperature sensor
GP10
External heating medium pump
RM1
Non-return valve
Designations according to standard IEC 61346-2.
DOCKING TO POOL
Heating of the pool is prioritised according to selected
settings in the indoor module. If the pool sensor (BT51)
is not connected, pool charging is not permitted to start.
OUTLINE DIAGRAM VVM AND POOL 310
-CL11
-CL11-AA25
-CL11-EP5
-CL11-GP12
-CL11-BT51
-CL11-GP9
-CL11-HQ4
-EB101
NOTE
GP10 and BT25 is only required for VVM225!
64
-CL11-QN19
-EB15
-RM1
-CL11
-GP10
-EB15
-BT25
POOL 310 | GB

Werbung

loading