Herunterladen Inhalt Inhalt Diese Seite drucken

Disposal Of The Riveting Tool - FAR KJ 45 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für KJ 45:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
KJ 45
TOPPING UP THE OIL-DYNAMIC CIRCUIT (fi g. f17-f18)
The oil-dynamic circuit should be topped up after a long period of work or
when there is a power loss of the riveting tool. Put the riveting tool (not fed)
in a vertical position rotating the knob (M) towards the sign "+" up to the
end of stroke, and remove the plug (I) by means of a 4 mm Allen wrench
(equipped). During this operation check the oil level in order to avoid any
overfl owing. Then pour the oil VISCOSITY 32° into the oil container (S)
(equipped) which shall be screwed to its seat on the plug (I).
While keeping the riveting tool in vertical position and starting air feeding,
push the button (D) and make the riveting tool carry out some cycles until
air bubbles inside the container stop coming out. This condition indicates
that the topping up of the oil has been fully achieved. At this point stop the
air feeding and while keeping the riveting tool in a vertical position, unscrew
and close the oil container (S) and the plug (I) checking the soundness of
the hermetic washer and repeat all the adjustments for placing the insert
as indicated at page 14-15.
ATTENTION: It is very important to follow the above-mentioned instructions
and use gloves during oil topping up.
If you need to empty completely the hydraulic circuit, you must put the oil in
a suitable container and contact a company authorized to dispose of wastes.
ATTENTION!
Before disconnecting the compressed air hose, make sure
that it is not under pressure!
ATTENTION: Make sure that the oil fi ller cap (I) is tightened
at a torque corresponding to Min. 5 Nm ÷ Max. 8 Nm.
I
min. 5 Nm
max. 8 Nm
Revisione - 05
GB
D
MAINTENANCE
Daily maintenance
- Check that the threaded tie rod is not damaged.
- Check the supply system of the compressed air.
- Check that the stroke of the tool is suitable for the selected insert to
clamp (see the pertaining instructions for adjusting the stroke, indicated
at page 14).
- Check that there are neither air nor oil leakages. In this case replace
possible damaged connectors or seals.
- Check that the supply pressure of the compressed air does not exceed 7
bar.
Weekly maintenance
- Check the oil level controlling the stroke of the riveting tool. If necessary
fi ll up for preventing failures of the riveting tool as indicated (fi g. f18).
Overhaul of the riveting tool
It is advisable to carry out a complete overhaul of the riveting tool
after 600,000 cycles or every year.
In this case apply only to centres authorized by FAR S.r.l.

DISPOSAL OF THE RIVETING TOOL

Follow the prescriptions of the national laws for disposing of the riveting tool.
After disconnecting the machine from the pneumatic system,
disassemble it into its various components, sorting them
according to type of material: steel, aluminium, plastic, etc.
Then proceed to scrap the materials in accordance with
current laws.
f17
Date 04-2015
S
f18
19

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kj40Kj70

Inhaltsverzeichnis