Herunterladen Inhalt Inhalt Diese Seite drucken

Equipment Handling - probst STS-43-EH-23 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für STS-43-EH-23:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Operation
4.2

Equipment handling

Before starting work, always check that the battery is fully charged and that there is sufficient
hydraulic oil in the oil reservoir (→ see chapter "Before starting").
To prevent the implement from rolling away unintentionally, apply the parking brake of the front
wheel. In addition, work is only permitted on level and horizontal ground!
51200081
Using the hand crank
blade upwards as far as necessary until the
split material fits between the blades (see
scale for stone height (in cm/inch)).
Place the split material (stone) centrally on
the support table of the unit and, if necessary,
ca.
5
align it accordingly using the scale (45° angle
or measurements in cm and inches) on the
mm
support table. 
Using the hand crank
blade down so far that there is still a gap of
approx. 5 mm between the upper blade and
the material to be split (stone).
10 / 16
Split material (stone) must
always be positioned and split
in the CENTRE OF THE unit!
Off-centre splitting will
damage the unit.
, crank the upper
, crank the upper
GB

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis