To easily commission the EFOY ProCube, please follow the steps described in this
chapter. In addition, use the commissioning checklist, see chapter 3.11.
To decommission the EFOY ProCube, please follow the decommissioning checklist, see
chapter 7.
Risk of electric shock!
Check that the main switch of the power solution is turned off during
installation.
Follow the sequence given here during installation and commissioning.
1.
Preparation of router (if included in the ProCube). 2.
2.
Preparation of cabling for load connection and PV modules (if
applicable)
3.
Installation of EFOY Fuel Manager
4.
Installation and connection of EFOY fuel cartridges
5.
Installation and connection of battery
6.
Installation and connection of the EFOY fuel cell
7.
Installing the operating panel
8.
Switching on the main switch
Installation and maintenance may only be carried out by authorised persons
who are familiar with all safety regulations and ensure compliance with them.
When installing the EFOY ProCube, make sure that the ambient temperature is
within the permissible temperature range of the EFOY or EFOY Pro fuel cell and
the EFOY fuel cartridges.
Page 52
Commissioning