Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Box Contents; Unboxing And Installation - Planika KL21 Rio Montage- Und Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für KL21 Rio:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 16
3.

INSTALLATION

3.1. Box contents

1x complete Rio gas fireplace
2x Tempered glass screen
4x small glass holders
4x adjustable legs
1x AAA Batteries (placed under the ignition button)
1x box of decorative stones
1x 4 metre rubber gas linkage – installed
1x pressure regulator (37mbar) – installed
1x installation manual and user's manual

3.2. Unboxing and installation

• The contents of the boxes need to be carefully unwrapped from the foam foil.
• Remove the bags with decorative stones from the burner reservoir and place them away from it.
• Remove the Styrofoam placed on the unit.
• Carefully lift the appliance and pull out the glass shield wrapped in cardboard from the inside of the Rio.
• Check the completeness of the elements with the contents list.
• Make sure that the device nor its elements weren't damaged during the transportation (if they were, notify the
supplier).
• Place Rio on a flat, paved surface outside of the building, preferably on the place of final installation. Leave
sufficient space on the side of the appliance where control panel is located (minimum 1 m).
• The decorative stones are to be scattered evenly around the reservoir to completely cover the burner of the
fireplace.
• Install carefully the side glass shields (See point 3.3).
• If all the points were completed according to the instruction the gas bottle can be now connected
Fig. 2
– RIO top view and ignition elements detail
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis