Herunterladen Inhalt Inhalt Diese Seite drucken

Safety Procedures - probst SG-100-PGL2 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für SG-100-PGL2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Maintenance and care
7.4

Safety procedures

It is the contractor's responsibility to ensure that the device is checked by an expert in periods of
max. 1 year and all recognized errors are removed (→ DGUV norm 100-500).
The corresponding legal regulations and the regulations of the declaration of conformity must be
observed!
The expert inspection can also be done by the manufacturer Probst GmbH.
Contact us at:
We recommend affixing the inspection sticker "„Sachkundigenprüfung / Expert inspection" in a clearly
visible place (order no.: 2904.0056+Tüv sticker with year number) after the inspection has been done.
The check by an expert must be proved!
Device
Year
53100284
service@probst-handling.de
Date
Expert
25 / 26
Company
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

53100284

Inhaltsverzeichnis