Herunterladen Inhalt Inhalt Diese Seite drucken

React AERO Montageanleitung Seite 28

Trampolin & sicherheitsnetz
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step 4
Place all leg tubes inside the frame
circle to line up with T-tube
connectors.
Step 7
A�ach the small hook end of spring
into one of the triangle rings on the
mat and insert the big hook end of
spring into the hole of the frame
tube by spring loading tool.
Step 5
Li� up the frame on one side
and insert T-Tube into W-
shaped / base leg underneath.
Repeat this step to connect
rest of W-shaped legs.
Note: two or more persons are
required to li� the frame on the
opposite side.
Step8
A�ach all springs evenly as
shown in the picture.
WARNING: Trampoline is under
heavy tension, more effort may
be required to a�ach the
springs to the frame. Be careful
not to pinch fingers or slip.
Serious injury may occur.
- 11 -
Step 6
Lay the jumping mat into the
circle. Keep the logo of bounce
mat upwards.
Step 9
A�ach all remaining springs.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Flora

Inhaltsverzeichnis