Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Installation Of The Machine In Peripherals - FLUX F 570 Originalbetriebsanleitung

Exzenterschneckenpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Commissioning

Commissioning
7.1

Installation of the machine in peripherals

Installation of the machine in peripherals is almost identical for F 570 and F 580. Due to the
higher weight of the motors, a suitable lifting gear is required for the motor flange version.
Both variants are also available in a version for horizontal use, which only differ in design of
peripherals. The fixation in horizontal position is realised by means of a pump trolley or con-
sole and is not considered in the following.
WARNING
Falling loads
Due to the weight of the machine, unexpected load reactions may occur when it is lifted for
positioning with the consequence of serious personal injury.
Do not stand or walk under suspended loads.
Preparing the drum
1. Secure the drum against falling over.
2. Attach the clamping device to the drum and tighten the star knob screw.
 The drum is now prepared.
Operating instructions VISCOPOWER
99

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

F 580

Inhaltsverzeichnis