Herunterladen Inhalt Inhalt Diese Seite drucken

Preface; Safety; Scope Of Delivery; Intended Use - Maico PPB 30 O Montageanleitung

Endmontage-set
Vorschau ausblenden Andere Handbücher für PPB 30 O:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1 Preface

1 Preface
These instructions contain important information
about final installation of the slide-in modules
and internal covers. Final installation takes
place once the plastering and paint work is com-
plete.
Note the enclosed safety instructions.
• For information on
shell installation
• For information on the
installation of ventila-
tion components,
commissioning and
the large variety of
setting possibilities for
the ventilation system
• For commissioning
software
• For information on
operation
• Accessory compon-
ents
Further instructions and videos
• Brief instructions for changing filters, setting
ventilation levels and operating modes
• Video - PP 45 Connecting the internal cover
• Video - PP 45/PPB 30 filter change
• Video - Connecting controls
• Video - Installation and teaching-in radio switch
DS 45 RC
• Videos - RLS 45 K Service menu, RLS 45 O
Service menu, RLS 45 RC Service menu
• Video - PP 45 RC Teaching-in master and
slave
• Video - PP 45 RC, PPB 30 RC installation
→ PP 45 / PPB 30 shell
installation instructions
→ PP45/PPB 30 install-
ation and commission-
ing instructions
→ PP 45 / PPB 30 op-
erating instructions
→ installation instruc-
tions enclosed with the
accessories

2 Safety

• Read these instructions and the enclosed
safety instructions carefully before installa-
tion.
• Follow the instructions.
• Pass these instructions on to the owner/operat-
ing company for safekeeping.

3 Scope of delivery

Scope of delivery depends on system con-
figuration.
PPB 30 O, PPB 30 K, PPB 30 RC ventilation
unit
● Internal cover, complete: Housing, 2x G3 air fil-
ter and front cover.
● Slide-in module including 2 fan units and 2
ceramic heat exchangers.
● 1 extension duct, 200 mm long; 1 centring ring;
2 sealing strips.
● 1 internal housing drilling template.
● These installation instructions.

4 Intended use

PPB 30 ventilation units with heat recovery are
used for air ventilation and air extraction of apart-
ments, offices and similar rooms. They are suit-
able for new buildings as well as renovation work.
The units are designed for 24h operation. The
housing unit's ventilation system should be con-
figured in accordance with DIN 1946-6.
PPB 30 are balanced ventilation units, which are
the ideal choice for use in exhaust air rooms
(bathroom, WC or kitchen with windows) and
ventilate and extract air from the rooms at the
same time. Exhaust air mode is started automat-
ically depending on the setting or can be started
manually at the touch of a button.
PPB 30 are stand-alone units or can be used in
groups with other PPB 30/PP 45 units. PPB 30
units have degree of protection IP X4. The protec-
tion zone must be determined depending on the
unit variant used.
PPB 30 are installed in exterior walls (wall thick-
ness 320-790 mm, installation position with slight
incline towards the exterior wall) and are connec-
ted to a permanently wired electrical installation.
The PPB models "O" for Object, "K" for Comfort
and the Radio Version "RC" are available. The
units are operated using an RLS.../ DS 45 RC
room air control suitable for the type.
31

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ppb 30 kPpb 30 rcRls 45 oRls 45 k

Inhaltsverzeichnis