Herunterladen Inhalt Inhalt Diese Seite drucken

Märklin Central Station 3 Bedienungsanleitung Seite 64

Vorschau ausblenden Andere Handbücher für Central Station 3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Completing the Track Diagram Control Screen
Now a second track is put in the station and the oval is closed. To do this we add five more track path
items, position them as shown below, and rotate them as required for the right alignment (lower left
image). Finally, the turnouts and track path items are connected with each other.
Half of the track diagram is now ready. Now comes
the station and the rest of the oval: We pull the
turnout „W 3R" to the lower right section of the board
and rotate it to a horizontal position (upper left image),
activate the connection mode at the turnout „W 2L"
(upper right image) and connect them with the right
turnout (left image).
Adding Signals
Now come the signals: First, we pull the signals into position: As soon as they are above the right track
section, we lift our finger from the display. The signal docks automatically at the track in question.
Then we activate the rotation mode in each case and adjust the angle: the left signal at 270 degrees
(left image) and the second signal at 90 degrees for the opposite direction of travel.
Track Diagram Control Screen Finished
At the end, you end the
editing mode by tapping
on the tool symbol. The
track path items are
thereby turned off (left
image).
Congratulations, you
have created your first
track diagram! You
have surely noticed that
the editing of the track
diagram becomes a little
easier each time you do
another step.
24

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis