Herunterladen Inhalt Inhalt Diese Seite drucken

Tank Filling; Unit Activation - Bosch ACS 763 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
en
| 58 | ACS 763/863 | Initial settings
5.12
Tank filling
This procedure transfers refrigerant from an external
tank to the station internal tank. The operational ca-
pacity of the internal tank is 17.4 kg.
i
Use the arrow buttons to move the cursor; use the
keypad to enter a value.
1. The station displays the fields to enter the desired
amount of refilling, the rechargeable amount of re-
frigerant, and the amount of refrigerant which can
be recovered inside the internal tank.
2. Enter the desired amount of tank refilling and se-
lect
to proceed.
i
Add at least 4 kg (8,0 lb) of refrigerant to make sure
that the quantity available is enough for the charge.
3. Connect the low pressure service hose (blue) to
the liquid fitting on the external tank.
4. Open the valve of the connection on the hose turn-
ing the ring nut clockwise.
5. Place the external tank in such a way that the re-
frigerant flows into the connection.
6. Open the external tank valve.
7. Select
to start filling the tank.
8. If the refrigerant identifier is installed, the station
verifies that the refrigerant contained in the cylin-
der is R1234yf and is not contaminated.
« The display shows
REFRIGERANT IDENTI-
FIER INITIALIZATION
SAMPLE ANALYSIS
"
The station starts filling the internal storage tank.
This takes 15 - 20 minutes.
i
If the station detects a problem with the refrigerant
contained in the cylinder, refer to the Refrigerant
Identifier section in this manual.
i
The station stops when the specified amount of
refrigerant has been transferred to the internal tank
or when the external tank is empty.
9. Follow the instructions on the display.
10. Close the valve of the connection turning the ring
nut counterclockwise.
11. Close the external tank valve.
12. Select
to return to the Functions Menu.
"
The station is ready for operation.
i
It is necessary to complete the entire Initial Setup
sequence before using the station. If it is not com-
pleted, this initial setup sequence is repeated every
time the station is switched on.
i
It is not necessary to calibrate the scale as it has
been calibrated at the factory.
|
1 689 989 610
2020-12-01
i
5.13
Failure to register and activate the station within
30 days of initial start-up causes the station to lock
and the impossibility to use it.
1. Call up the Main Menu.
2. Select
3. Select
4. Select Settings.
5. Select Unit Activation.
6. Select
7. Open an Internet browser on a personal computer
8. Enter your username and password, and log in to
i
and
REFRIGERANT
9. Enter the Personal Identification Number of the
10. Enter the activation code in the correct field on the
i
11. Note the activation code and keep it in a safe place.
12. Select
13. Select
"
When the tank is filled, the display does not show
the same quantity as the programmed one. The dis-
play shows the amount of refrigerant available for
charging, equal to 2.2 kg less than the total amount
of refrigerant contained in the tank.

Unit activation

.
.
« The display shows
XX DAYS OF THE TRIAL
PERIOD REMAINED to activate the unit.
Activate now?
to start the activation process.
« The display shows
code: xxxxxxxxxxx
Enter the code: xxxxxxxxxxxxxxxxxxxx
and enter
https://register.servicesolutionsportal.com
access the website.
If you are accessing the site for the first time, click
the Registration button to create your own user-
name and password.
station to receive an activation code.
station.
Enter the code exactly as it was received. Use up-
percase if necessary.
to confirm.
« The station displays a message indicating that
the activation has been successful.
to print or
to exit the function.
Activation of the station has been successful.
.
Robert Bosch GmbH

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Acs 863Acs 863-oe

Inhaltsverzeichnis