Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation - Simons Voss Technologies RouterNode 2 Kurzanleitung

Vorschau ausblenden Andere Handbücher für RouterNode 2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
All manuals and user guides at all-guides.com

6. Initial operation

6 Initial operation
System 3060:
RouterNode 2
MobileKey:
SmartBridge
42 / 184
IMPORTANT
Insufficient fit due to removed clips
The housing cover is positioned and held by clips on
the webs. If you saw off or break off these clips, the
housing cover will no longer be held at this point.
1. Do not remove any bars that have a clip over them.
2. Do not damage clips during sawing.
4. Use a suitable saw to saw through the bars at both
ends of the desired opening to the base plate.
5. Bend the bars back and forth at the desired open-
ing until the bars break.
9
The housing is prepared for surface mounting.
After installation, the device must be put into
operation. Initial operation varies depending on the
system.
LSM must be able to communicate with RouterNode
2. The connection between LSM and RouterNode 2 is
established by using the WaveNet Manager. For
details, please refer to the manuals for RouterNode 2,
WaveNet and WaveNet Manager.
You can manage network-compatible locks wirelessly
in MobileKey with the SmartBridge. To do this, set up
at least one SmartBridge via the MobileKey interface.
Please refer to the MobileKey and SmartBridge
manuals for details.
RouterNode 2, GatewayNode 2,
SmartBridge
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Gatewaynode 2Smart-bridgeNw10.900210

Inhaltsverzeichnis