Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Post-Processing Of Support Sleeve - Dräger P-Serie Montageanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly

Post-processing of support sleeve

Disassemble the shoulder straps in the upper area in
accordance with the Instructions for use.
Place the drilling jig in position and centre.
Drilling jig in position
Using a 12.5-mm twist drill, drill a hole into the carrier
frame at the location indicated by the hole in the drilling
jig. Then remove the drilling jig, deburr the drill hole on
both sides and remove any shavings from the support
sleeve.
Assembly
23

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pss bg 4R 34 259

Inhaltsverzeichnis