Herunterladen Inhalt Inhalt Diese Seite drucken

Pre-Delivery Inspection; Familiarisation - Advance BI BETA 2 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

PRE-DELIVERY INSPECTION

Before supplying your canopy your sales agent should make a general test flight and set the
brakes controls.
Brakes :
There should be a minimum 7 cm free play between the brakes released position and the start
of action on the canopy.

FAMILIARISATION

We advise you to gradually become familiar with your
canopy by initially flying in calm conditions on a site
that you are experienced with. Before each flight make
a thorough pre-flight inspection, checking for any tears,
tangling of the suspension lines, risers, all quick links
and the harness.
A few practise inflations in easy conditions will strengthen
your trust in the handling of the BI BETA 2 from the outset.
This glider is not certified for powered acrobatic flight. Please fly
the glider within its limits and avoid extreme situations. It should therefore
only be flown by pilots that have suitable experience.
Pre flight check :
Lines free.
Canopy open.
Harnesses and helmets buckles properly closed for the pilot and for the passenger
(reserve parachute OK).
Wind direction and strength observed and evaluated.
Airspace and visibility OK.
42

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis