Herunterladen Inhalt Inhalt Diese Seite drucken

Verlinde Stagemaker SL5 504 M2 A D8+ Benutzerhandbuch Seite 98

Inhaltsverzeichnis

Werbung

11. Assemble the new double brake.
Pay attention to the orientation of the
HINWEIS
brake lining.
12. Install the new brake on the shaft.
1.
Secure the fixation with the three
screws. Pre-tighten the screws by
hand.
2.
Tighten the screws with a tool.
3.
If the brake has two more screws,
remove the screws.
There may be two extra screws on the
brake. The screws are used during
transportation to keep the brake
HINWEIS
components together. Remove these
two screws when you have installed the
new double brake.
The top brake is the main brake, and the
HINWEIS
bottom brake is the secondary brake.
13. Lead the brake cables through the hoist
frame. Pull the brake cables carefully out
on the motor side.
Dieses Dokument und die darin enthaltenen Informationen sind das alleinige Eigentum von Verlinde S.A.S. und stellen
ein Geschäftsgeheimnis dar, d.h. das Dokument und die Informationen sind vertraulich, gesetzlich geschützt und nicht
für die Öffentlichkeit bestimmt. Ohne ausdrückliche schriftliche Genehmigung von Verlinde S.A.S. darf der Inhalt dieses
Dokuments weder verändert, vervielfältigt, an Dritte weitergegeben oder anderweitig verwendet werden. Copyright
2020 © Verlinde S.A.S. Alle Rechte vorbehalten.
7 MAINTENANCE
4/2020

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Verlinde Stagemaker SL5 504 M2 A D8+

Inhaltsverzeichnis