Herunterladen Inhalt Inhalt Diese Seite drucken

Warranty; Safety Recommendations; Unit Location - Carrier 50CJ Serie Installations-, Betriebs- Und Wartungsanleitung

Präzisions-klimaschränken
Vorschau ausblenden Andere Handbücher für 50CJ Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 78

16 - WARRANTY

The warranty is effective for a period of 12 months from the commissioning date, provided said date occurs within three months of the 
invoice date.
It is effective for a period of 15 months from the unit invoice date in all other cases.
NOTE: for further information, refer to the application of the CARRIER warranty.

17 - SAFETY RECOMMENDATIONS

To protect against accidents while installing, commissioning and adjusting the unit, the following settings must be kept in mind:
- Pressurised refrigeration circuit
- Presence of refrigerant
- Presence of voltage
- Installation location
- Temperature up to 150°C
Only experienced and qualified persons may work on this equipment. The recommendations and instructions given in the maintenance 
brochures and the special instructions on the labels must be followed.
Always comply with applicable standards and regulations.
IMPORTANT: before carrying out any work on the unit, make sure it is powered off.

18 - UNIT LOCATION

The installer must check the following points before handling, placing or connecting the unit:
-   T hese units are intended for use outdoors, near a building, on a deck/patio or in a garden. Although it is rain resistant, it may be 
installed under a shelter with adequate ventilation on all four sides.
- The ground or surface on which the unit is placed must be strong enough to support the weight of the unit.
- Position the unit above the average snow depth for the region where the unit is installed.
- The unit must be perfectly level.
- Leave sufficient room around the unit to allow easy access for servicing and
- maintenance.
Sound level: our units are designed to operate quietly. However, as soon as you begin designing your system, you should take the 
following into consideration: the outdoor environment for radiated noise, and the building type for solid and air-borne noise transmission 
(vibrations).
If in doubt, have an analysis performed by an acoustical engineer.
65

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis