To verify the installation
When the CGC500™ is configured and enabled enter: Nanogrid - > Grid UI in the WebUI.
1.
Verify that all active charging stations are connected to the CGC500™ with a green mark in the "On-
line" column.
2.
Connect an electric vehicle to a charging station. Verify that the electric vehicle gets allocated current
and that "State" is updated to "ActiveCharging".
To recycle the product
The product must be recycled as electronic equipment. Follow the local requirements for recycling of elec-
tronic equipment.
References
1.
CCU NanoGrid Configuration Manual, Pd_CM_004
CTEK SWEDEN AB
1
2
9