Herunterladen Inhalt Inhalt Diese Seite drucken

Carrying Out The Zero Adjustment; Carrying Out The Span Calibration - Dräger Polytron 6100 EC WL Gebrauchsanweisung

Vorschau ausblenden Andere Handbücher für Polytron 6100 EC WL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

en
Calibration

10.4 Carrying out the zero adjustment

Prerequisites:
– Warm-up phase of the sensor complete
– The test gas supply has been prepared.
– A connection between the gas detector and PolySoft has
been established.
Carrying out the zero adjustment:
1. Start the zero adjustment in PolySoft.
 The ISA100 Wireless
"Measured value invalid."
2. Follow the instructions of the wizard in PolySoft.
Flow with test gas supply: 0.5 L/min ± 10 %
3. After completion of the zero point adjustment, switch off
the gas flow and remove the calibration adapter.

10.5 Carrying out the span calibration

Prerequisites:
– Zero point adjustment has been carried out.
– The test gas supply has been prepared.
– A connection between the gas detector and PolySoft has
been established.
Carrying out the span calibration:
1. Start and confirm the span calibration in PolySoft.
 The ISA100 Wireless
"Measured value invalid."
2. Follow the instructions of the wizard in PolySoft.
Flow with test gas supply: 0.5 L/min ± 10 %
3. After completion of the span calibration, switch off the gas
flow and remove the calibration adapter.
interface transmits the status
interface transmits the status
Dräger Polytron 6100 EC WL, Dräger Polytron Repeater ISA

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Polytron repeater isa

Inhaltsverzeichnis