5. Let one side of the extensible pipe go outside through the hole of 170 mm, see
figure 3.
6. 4 ST4*8 big flat screws will be used to connect the inside chimney into the hanging
board. Then put up the outside chimney, two hooks will be used to put up the
outside chimney in order to the next installation, see figure 4.
outside chimney
7.
Fix the v-flaps.
8. Hold up the hood, 16 M4*10 big flat screws will be used to connect the hood
body into angle iron, see figure 5.
Figure 5
9. Put the extendable pipe on the outlet. After ensuring everything is OK, put down the
hook from the outside chimney, then the installation is complete, see figure 6 and 7.