Warnings
Use the torque wrench to tighten the
nut as described below: 17 Nm for
lines of 1/4'' and 40 Nm for lines of
3/8''.
Once the connection has been made
properly, the refrigerant lines are
to be checked for leak tightness by
applying nitrogen with a pressure of
0.25 MPa (25 bar).
Remove an appropriate length (10
to 13 cm) from the pipe's standard
insulation.
Presentation
In order to prevent gas
from escaping apply
only refrigerant oil
POE to the expanded
surface.
Replace the insulation by sleeves
supplied and seal the original insula-
tion with adhesive tape.
Close the cover with the lower sea-
ling cap once the outlets have been
cut off and the electrical connections
have been made.
Installation
Tighten with two keys
Spanner
Connection nut
Torque wrench
Line
Internal unit line