Herunterladen Inhalt Inhalt Diese Seite drucken

Grundfos DME 60 Montage- Und Betriebsanleitung Seite 32

Inhaltsverzeichnis

Werbung

7. Calibration
It is important that the pump is calibrated after
installation to ensure that the correct value (ml/h or l/
h) appears in the display.
The calibration can be carried out in two different
ways:
Direct calibration.
The dosed quantity of 100 strokes is measured
directly. See section
7.1 Direct
Check calibration. See section
calibration.
The pump
performs 100
dosing strokes
Operating display
Fig. 26
32
calibration.
7.2 Check
Operating display
Operating display
without changes
Set value.
See section
7.2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Dme 150Dme 375Dme 940

Inhaltsverzeichnis