Herunterladen Inhalt Inhalt Diese Seite drucken

Start-Up; Technical Data - Honeywell IDENT-KEY 3 Montage, Anschluss, Anleitung

Vorschau ausblenden Andere Handbücher für IDENT-KEY 3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

46
8.

Start-up

All system parts must be correctly installed. Measure all the lines before connecting to the ID central
control unit, to detect possible line interruptions or short circuits, and ensure that there is no ground
fault.
The switching elements (RS-485 readers or IK2 operating unit/block lock) must be connected
correctly.
After completing installation and switching on the operating voltage, program the EU using WINFEM
Advanced. Proceed as described in the User Manual WINFEM Advanced (from V02.xx).
9.

Technical data

Rated operating voltage U_b
Operating voltage range
Operating voltage
U_BDT
Current consumption:
-
EU - no-load current
-
per relay
-
Blocking element actuation
-
Buzzer
-
Outputs IK2 operating unit
(Buzzer / disarmed / armed)
-
SLIM-LOCK
-
plus 1 IK3 reader
Analogue inputs
Semi-conductor outputs
Contact rating of relays:
-
Fault
-
all others
Interface to readers
Protection class as per EN 60529
Environmental class as per VdS
Operating temperature range
Housing dimensions (W x H x D)
Colour
Mounting and Connection Instructions IK3 Evaluation Unit Conventional
for one reader
12 V DC
10 V to 15 V DC
12 V DC, short-circuit resistant,
current-limited at 200 mA max.
< 15 mA (maximum value)
+ 17 mA
+ 1 mA
+ 3 mA
+ 3 mA per output
< 230 mA for approx. 200 ms
Type 25 mA
5
V DC, monitored at 12k1
12 V DC, short-circuit resistant
current-limited at 50 mA max.
max. 0.5 A, 30 V AC/DC, 10 VA
max. 2 A, 30 V AC/DC, 30 VA
RS-485
IP30
II
-5 °C to +55 °C
196 x 142 x 32 mm
traffic white (similar to RAL 9016)

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ik3

Inhaltsverzeichnis