Herunterladen Inhalt Inhalt Diese Seite drucken

Autoclave - Operation; Loading The Autoclave; Close And Locking - CertoClav MultiControl 2 Bedienungsanleitung

Laborautoklav
Vorschau ausblenden Andere Handbücher für MultiControl 2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Manual_MC2_DE_EN_V2.docx

Autoclave - operation

READ INSTRUCTIONS BEFORE FIRST USE!
The first run should be without load; only with water.

Loading the autoclave

Fill in 1.5 liters of distilled water. It is possible to insert more water, yet this will increase
heating up and cooling down time.
Put in instrument tray and basket and place loading. It is important that steam can circulate
freely.
Attention: Do not autoclave tightly sealed containers (especially glass bottles) since there is
no pressure compensation.

Close and Locking

Check if the gasket is inserted in the lid.
Press the red knob and turn it clockwise to OPEN.
Place the lid on the chamber and turn it clockwise until the handles are in line with
each other.
Turn the red knob counterclockwise to lock the lid.
We recommend connecting a tube to the steam release cock to direct the steam to a
condensation vessel. We offer both under art. no. 8582020.
Plug in the power cable. Plug in the heater cable into the pot and controller. Plug in
the temperature sensor cable and screw it into the controller.
ATTENTION: on Longtime cycles avoid cooking dry and overheating (could damage the
autoclave). Check the water level. The steam release cock has to be closed– remove the
seal for this.
CertoClav Sterilizer GmbH
Georg Grinninger-Str. 37
A-4050 Traun / Austria
www.certoclav.com
support@certoclav.com
Page 17 of 44

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis