Herunterladen Inhalt Inhalt Diese Seite drucken

Before Starting The Equipment; Assembly And Starting - Parkside PKO 400 B2 Bedienungs- Und Sicherheitshinweise Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für PKO 400 B2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 74
6. Before starting the
equipment
Before you connect the equipment to the mains
supply make sure that the data on the rating plate
are identical to the mains data.
Check the equipment for damage which may
have occurred in transit. Report any damage
immediately to the transport company which
was used to deliver the compressor.
Install the compressor near the point of con-
sumption.
Avoid long air lines and supply lines (extensi-
on cables).
Make sure that the intake air is dry and dust-
free.
Do not install the compressor in a damp or
wet room.
The compressor may only be used in suitable
rooms (with good ventilation and an ambient
temperature from +5 °C to 40 °C). There must
be no dust, acids, vapors, explosive gases or
inflammable gases in the room.
The compressor is designed to be used in dry
rooms. It is prohibited to use the compressor in
areas where work is conducted with sprayed
water.
The oil level in the compressor pump has to
be checked before putting the equipment into
operation (see 9.4).

7. Assembly and starting

Important!
You must fully assemble the appliance
before using it for the fi rst time!
You will require the following tools for assembly
and installation:
1 x open-ended wrench size 13 mm (not in-
cluded)
2 x open-ended wrench size 16 mm (not in-
cluded)
Anl_4010164.indb 12
Anl_4010164.indb 12
GB
7.1 Fitting the wheels (11)
Fit the supplied wheels as shown in Figure 5.
7.2 Fitting the supporting feet (8)
Fit the supplied supporting feet as shown in
Figure 6.
7.3 Fitting the air fi lters (15)
Remove the transportation stopper (B) and screw
the air fi lters (15) securely to the equipment (Fig.
7, 8). Make sure that the intake opening on the air
fi lter faces down.
7.4 Changing the transportation cover (A)
Remove the transportation cover from the oil fi ller
opening (21) and insert the supplied oil sealing
plug (16) into the oil fi ller opening. (Fig. 9, 10.)
7.5 Mains connection
Before you use the machine, make sure that
the mains voltage is the same as the operating
voltage (see the rating plate).
Long supply cables, extensions, cable reels
etc. cause a drop in voltage and can impede
motor start-up.
At low temperatures below +5°C, sluggish-
ness may make starting difficult or impossible.
7.6 ON/OFF switch (Fig. 2)
Pull the ON/OFF switch (17) upwards to switch
on the compressor. To switch off the compressor,
press the ON/OFF switch down.
7.7 Setting the pressure (Fig. 1-3)
Use the pressure regulator (3) to set the pres-
sure on the pressure gauge (5).
Turn the pressure regulator knob to adjust the
pressure.
The set pressure can be drawn from the quick-
lock coupling (4).
The vessel pressure can be read off the pres-
sure gauge (6).
The vessel pressure is drawn from the quick-
lock coupling (20).
- 12 -
25.03.13 15:56
25.03.13 15:56

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis