4. Water Piping Connection
The indoor unit is equipped with water outlet and inlet bare connection. There is an air-vent for air purging that is fitted
at the outlet water header.
3 way valve is required for cycling off or bypass the chilled water.
Black steel pipe, polyethrene pipe, PVC pipe and copper tube are recommended in field installation.
All types of piping and connection must be insulated by polyurethane (ARMAFLEX type or equivalent) to avoid
condensation.
Do not use contaminated or damaged pipe and fitting for installation.
Some main fitting components are needed in the system to enhance the capacity and ease the service, such as gate valve,
balancing valve, 2 way or 3 way valve, filter, strainer etc.
Chiller
Model: CE07CBW/CE10CBW/CE15CBW/CE20DW/CE25DW/CE30DW/CE40DW/CE50DW
FCU 1
VALVE
L
N
3WV
x1
Chiller
This is proposed wiring connection. It may change subject to the chiller unit and must comply with the local and national code and
regulations.
Gate Valve
3 Way Valve
FCU
Gate Valve
Good Control
Bad Control

ELECTRICAL WIRING CONNECTION

FCU 2
VALVE
L
N
3WV
x2
Gate Valve
2 Way Valve
FCU
Gate Valve
FCU 3
VALVE
L
3WV
x3
X1,X2,X3
!
There must be a all pole switch with a
minimum 3mm contact gap and fuse /
circuit breaker as recommended in the
fixed installation circuits.
1-4
Gate Valve
FCU
Gate Valve
Worst Control
N
220-240V/1ø/50Hz
220~240V/1 /50Hz
208-230V/1ø/60Hz
R
S
T
N
3 way valve
3WV
Relay (220-240V,10A)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis