11. Start-Up Troubleshooting

Start-up Troubleshooting concerns the solving of the main problems that can occur during the fi rst start-up phase.
To examine the complete troubleshooting, refer to the user manual on the CD that comes with the package
Should problems arise in the unit's commissioning phase, it is possible to solve the problem by looking for the
corresponding problem in the table and following the instructions.
Warning! Tampering with the unit, even to solve a problem, leads to the loss of the unit's warranty. Before
undertaking any tampering that could cause the loss of warranty, contact the Power-One customer assistance
service.
Problem
The inverter does not start.
Display message: none
Green LED: OFF
Yellow LED: OFF
Red LED: OFF
The inverter does not establish parallel with the
grid.
Display message: No Vac
Green LED: FLASHING
Yellow LED: ON
Red LED: OFF
The inverter does not establish parallel with the
grid.
Display message: PARAMETERS OUTSIDE TOLERANCE.
Green LED: FLASHING
Yellow LED: ON
Red LED: OFF
The inverter does not establish parallel with the
grid
Display message: W003 Grid Fail
Green LED: FLASHING
Yellow LED: ON
Red LED: OFF
Photovoltaic Inverters
Possible causes
There is no input voltage (DC) present or
it is present but with reversed polarity.
There is no grid voltage
Faulty grid cable connection.
Faulty grid cable connection.
One or more grid parameters are outside
the range permitted for connection to
the grid.
19 - EN
Checks/Possible solutions
Check the status of the built-in disconnecting
switch or the external disconnecting switches;
Check the state of any internal or external
fuses;
Check the inverter' s input voltage polarity;
Check that the input voltage is at least more
than 120V (refer to the technical data).
Check the status of the AC side disconnecting
switch;
Check the inverter' s AC side connections
(ref. par. 5 of this guide) and repeat the
commissioning procedure.
Check the inverter' s AC side connections
(ref. par. 5 of this guide) and repeat the
commissioning procedure.
Check the inverter' s AC side connections (ref. par.
5 of this guide) and repeat the commissioning
procedure.
Check that the grid voltage, at terminal block
heads, is within the range (width and frequency)
permitted for the inverter' s operation and repeat
the commissioning procedure.
If this error is frequently repeated, consult the
user manual for further information.