Herunterladen Inhalt Inhalt Diese Seite drucken

ABB ACH580-04 Schnellinstallationsanleitung Seite 6

Vorschau ausblenden Andere Handbücher für ACH580-04:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 23
6 EN – Quick installation guide
Step
1
Ground the input cable shields (if present) 360 degrees at the cabinet lead-through.
2
Connect the twisted shields of the input cables and separate ground cable (if
present) to the cabinet grounding busbar.
3
For option +B051:
• Step drill carefully sufficiently big holes to the lead-through clear plastic
shroud for the cables to the connected.
EN
• Align the holes in the vertical direction according to the alignment holes in
the shroud. Smooth the hole edges.
• Remove the plastic sheeting from both sides of the shroud.
DA
• Attach the cables firmly to the cabinet frame to prevent chafing against the
hole edges.
4
For option +B051: Put the conductors of the input cables through the drilled
DE
holes in the clear plastic shroud.
5
Connect the input power cable conductors to the L1/U1, L2/V1 and L3/W1
connection busbars.
ES
6
For option +B051: Move the lead-through clear plastic shroud along input
cables to its final position. Install the front clear plastic shroud.
7
Install the upper front cover.
FI
8
Remove the cardboard protective covering from the drive module air outlet.
9
For option +B051: Cut the hole for the lead-through clear plastic shroud in the
FR
side clear plastic shroud. Install the side and top clear plastic shrouds to the
drive module.
IT
Install the air baffles
See figure
W
on page
NL
hardware manual.
Connect the control cables
PL
See figure
X
on page 98.
PT
1. Ground the outer shields of all external control cables 360 degrees at the cabinet lead-
through.
2. Ground the pair-cable shields of external control cables to a grounding clamp below
RU
the control unit. Leave the other end of the shields unconnected or ground them
indirectly via a high-frequency capacitor with a few nanofarads, eg, 3.3 nF / 630 V.
SV
3. Connect the conductors to the appropriate terminals of the control unit. See page 7.
4. Wire the optional modules if included in the delivery.
TR
ZH
Task (input cables)
98
and Guidelines for planning the cabinet installation in the
Figure
Page
-
-
-
-
R
97
S
97
T
97
U
98
U
98
U
98
V
98

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Acs580-04Acq580-04

Inhaltsverzeichnis