Herunterladen Inhalt Inhalt Diese Seite drucken

Install Optional Modules, If Any; Install Side Plates And Covers - ABB ACQ580-01 Kurzanleitung Für Die Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21

Install optional modules, if any

See chapter Electrical installation in ACQ580-01 (0.75 to 250 kW) hardware manual
(3AXD50000035866 [English]).

Install side plates and covers

See figure
R6...R9 Figures E
IP21
1. Reinstall the side plates of the cable entry box. Tighten the retaining screws with a
screwdriver.
2. Slide the cover of the cable entry box on the module from below until the cover
snaps into place.
3. Reinstall the module cover. Tighten the two retaining screws with a screwdriver.
IP55
1. Reinstall the module cover. Tighten the two retaining screws with a screwdriver.
For start-up instructions, see chapter
EN – R6...R9 Quick installation guide 19
on page 85.
EN – Quick start-up guide
on page 89.
R0-
R4
R6-
R9
R6-
R9
EN
DE
ES
FR
IT
RU
SV
ZH

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis