Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Start-Up; Installation - Mettler Toledo InPro 7000-V Bedienungsanleitung

2-pol-leitfähigkeits-messzellen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

12
4. The metal body of the conductivity sensors or the safety weld-in socket
or the fitting InFit 76*-*** or InTrac 7**-*** or other appropriate fitting
must be electrically connected to the equipotential bonding system.
5. The metal body of the conductivity sensors or the safety weld-in socket or
the fitting InFit 76*-*** or InTrac 7**-*** or other appropriate fitting is
optionally included in the routine pressure test of the system.
3

Initial start-up

3.1

Installation

The sensors are to be mounted in such a way that the sample medium
flows directly into the sensor through the orifice at the tip and re-emerges
through the vent holes. Any other installation position of the sensors can
create the risk of formation of airlocks, or of contamination through depos-
its of solid matter.
in the sensor cavity
30º
in the sensor cavity
Sensor orientation
Flow of sample medium must be toward the face of the sensor. Air bubbles
and solid matter deposits are to be avoided. A minimum clearance of 0.6
cm (
the sensor.
Vertical mounting (top entry) in a pipe is recommended only if the pipe is
full and no air bubbles are able to develop in the flow.
In the event of side mounting (side entry) of the sensor, vertical upward
flow of sample process medium must be ensured.
InPro 7000-VP Series
52 002 091
Flow
direction
/
") between sensor and pipe wall must be maintained at the tip of
1
4
Flow direction
Vent hole
T-piece
Orientation in fluids
with low velocity
© 02 / 2017 Mettler-Toledo GmbH, CH - 8606 Greifensee
InPro 7000-VP Series
Sensor
Printed in USA

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis