3859_bw.qxp:bw 30-10-2008 14:23 Pagina GB16
7. Installation guide
Introduction
Before you start using your Auping
Royal bed or if you have dismantled it
to clean or move it, you have to fit and
install the Ultimate Climate system
again in full or in part.
In this chapter you can read how to set
up the complete system.
Use the installation card and/or
template included.
7.1 Description
GB16
Euro, UK or USA plug
fig. 5
A. Transformer
B. Control box
C. Connectors
D. Remote control
7.2 Safety
The Ultimate Climate meets current
CE directives.
A schematic connection diagram can
be found on the underside of the
control box.
Only
use
the
Ultimate
mattress in combination with an
Auping Royal mesh base.
Check that the connecting voltage of
the transformer corresponds with the
mains voltage in your home.
7.3 Fitting the parts
You need only to remove the mattress
cover if you want to wash or dry-clean it
or if you suspect that plug D (see fig. 9)
is not connected properly.
Climate