Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of Battery Pack; Commissioning - KERN VFB 2T-3 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.7 Installation of battery pack

5.8 Commissioning

Prior to starting-up the weighing system, load the rechargeable battery completely.
To activate the weighing system, press the
The operating temperature for the electronic system and the weighing cells will have
been reached after three to five minutes. . Prior to this, deviations of c. 0.3% are
possible.
Loads should not be lifted before this zero adjust is complete.
VFB-BA-e-1811
4 Loosen the screws in the
casing of the display rear
part.
Loosen and remove two
upper and two bottom
screws. Replace the pack
of batteries. Fix and screw
the display casing back.
key.
14

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis