Herunterladen Inhalt Inhalt Diese Seite drucken

Siemens SED1 Betriebsanleitung Seite 14

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.2.3.3
Mains and motor connections – frame sizes 4 to 7
Terminal positioning on
frame sizes 4 to 7
14/62
Siemens Building Technologies
Landis & Staefa Division
To gain access to the mains and motor connection terminals on the SED1, remove the
front cover of the drive (on frame size 7: only the bottom cover).
The total cable length between the variable speed drive and the motor must not exceed
100m. If the motor cable is placed in an earthed cable protection tube, the maximum
length must not exceed 50m.
Frame Size 7
L1
L2
L3
U
V
Frame Size 6
L1
L2
L3
DIP Switches
Note: Switch 6 is
L1L2 L3
Frame size
Tightening torque
on motor and
control terminals
SED1 Variable Speed Drive
Electrical installation
W
I
PE
O
P
U
V
W
1 3 4 5 6
2
not used
1
2
3 4 5 6 7 8 9
Frame Size 4/5
PE PE
4/5
1.1 Nm
DC -
DC +
27
26
25
24
23
22
21
10
11 12
13
14
15
16
17
18
19
20
D C-D C+ U V W
6
7
3.0 Nm
30 Nm
Frame Size 6
Control
Terminals
Power and
Motor Terminals
CM1U5191X
01.2000

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis