Herunterladen Diese Seite drucken

Grohe Atrio Bedienungsanleitung Seite 6

Vorschau ausblenden Andere Handbücher für Atrio:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
b958881.book Seite 3 Freitag, 15. März 2002 2:11 14
GB
Application
Surface mounted thermostatic mixers are designed for
hot water supply via pressurized storage heater and
utilized in this way provide the best temperature
accuracy. With sufficient power (from 18 kW
or 250 kcal/min) electric or gas instantaneous heaters
are suitable.
Thermostats cannot be used in connection with low
pressure storage heaters.
All thermostats are adjusted in the plant at a flow
pressure on both sides of 3 bar.
If temperature deviations should exist due to special
installation conditions, then the thermostat is to be
adjusted to the local conditions (see Adjustment).
Specifications
Minimum flow pressure without
downstream resistances
Minimum flow pressure with
downstream resistances
Max. working pressure
Recommended flow pressure
Test pressure
Flow rate at 3 bar flow pessure
Max. water temperature at hot water inlet
Recommended max. stored
temperature (energy saving)
Safety check
Hot water temperature at supply connection
min. 2 °C higher than mixed water temperature
Cold water connection
Hot water connection
Minimum flow rate
At a flow pressure over 5 bar it is recommended that a
pressure reducing valve be fitted in the supply line.
3
Installation
Flush pipes thoroughly!
Install S-unions, dimensions necessary, see fold-out
page I, Fig. [1].
Fit swivel spout, see Fig. [1].
Screw-mount the mixer, see Fig. [1] and [2].
1. Turn the pre mounted screw-ring (A) about 30°.
The screw-ring (A) can be placed from flat of nut to
connection piece of wall connection piece (B), see
Fig. [1] and [2].
2. Screw on wall connection piece (B) with open-ended
spanner 32mm until noticeable resistance is felt. To
avoid deformations at wall connection piece (B)
do not tighten too much, see Fig. [2]!
3. Slip screw-ring (A) on again on flat of nut from wall
connection piece (B). Turn the screw-ring (A)
about 30°, so that the screw-ring (A) is locked.
4. Over the screw-ring (A) the escutcheon (C) must be
screwed against the wall.
Refer to the dimensional drawing on fold-out page I.
Open cold and hot-water supply and check
connections for leakage!
Reversed union (hot on right - cold on left).
0.5 bar
Replace thermoelement (R), see replacement parts
fold-out page II, ref. No. 47 657 (1/2").
1 bar
Adjustment
For temperature-adjustment, see figs. [3] and [4].
10 bar
x
Before the mixer is put into service if the mixed
1 - 5 bar
water temperature measured at the point of
discharge varies from the specified temperature set
16 bar
on the thermostat.
approx. 20 l/min
x
After any maintenance operation on the thermostatic
80 °C
cartridge.
1. Open the shutt-off valve and check the temperature
of the water with a thermometer, see fig. [3].
60 °C
2. Pull off knob (D), see fig. [4].
38 °C
3. Unscrew screw (E) and pull off snap insert (F).
4. Pull off temperature control handle (G).
5. Turn adjusting nut (H) until the water temperature
reaches 38 °C.
right
6. Install temperature control handle (G) in such a way
left
that the 38° mark coincides with the mark (J) on the
mixer body, see fig. [3].
= 5 l/min
7. Fit snap insert (F) and install with screw (E), see
fig. [4].
8. Fit knob (D).
Temperature limitation
The safety stop limits the temperature range to 38 °C.
If a higher temperature is desired, the 38 °C limit can
be overridden by pressing the button (G1).

Werbung

loading

Diese Anleitung auch für:

34 06134 06334 062