Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Of Blade Prior To Commissioning - EFA 802 Betriebsanleitung

Druckluftmesser
Vorschau ausblenden Andere Handbücher für 802:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.2 Mounting of blade prior to
commissioning
Figure 2: Loosen the securing screw (item 38) and pull
the front shield (item 5) forward to remove it.
Shield, complete
Torque wrench
Figure 3: Power knife is ready for blade change.
Figure 4: Using the guide device, insert the blade into the
front chamber of the head piece (item 27). It is not
possible to mount the blade incorrectly.
Figure 5: Inserting blade into head piece (item 27)
Schmid & Wezel
D75433 Maulbronn,
Power knife
Page/ Seite
4/ 14
Figure 6: Move the guide device into the head piece to
the stop; ensure that the securing screw (item 38) is in
its rear position.
Figure 7: Using the supplied torque wrench (item 39, set
to 3 Nm), tighten the blade screw. Connect the power
knife to the maintenance unit (optional extra), using the
hose unit (accessory).
Connect the power knife with the hose unit
(accessory) to the maintenance unit (optional
extra). See also Fig. 8.
Set the maintenance unit to
6 bar, 1 drop of oil per minute . This adjustment
must be made when the power knife is in operation.
Version/ Ausführung
08.2005

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis