Herunterladen Inhalt Inhalt Diese Seite drucken

GEZE Perlan KS series Montageanleitung Seite 84

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 Nm
4
5
6
24
GB
4.3 Assembling the running rail
Starting from the left, slide components
into track in the following order:
1× in rail buffer, 2× roller carriage, 2× in
rail buffer, 2× roller carriage, 1× in rail
buffer.
Position the hold open spring on the end
at which hold open is required.
Observe direction of buffers.
Slide in rail buffer to the desired end stop
position and tighten to 5 Nm.
Slide deflection pulley into running rail.
Do not secure the deflection pulley.
At the opposite rail end, slide second de-
flection pulley into running rail and secure.
4.4 Fitting the door leaves
Engage door leaves in mounting bolt.
Firmly tighten lock nut.
For wall mounting: Fit the door leaf whose
coupling bracket faces the wall first as its
belt clamp screw is difficult to access.
Adjust leaf height by turning the suspen-
sion bolt clockwise or anticlockwise before
tightening the lock nut.

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Perlan aut series

Inhaltsverzeichnis