lEctrical connEction of
Legend
1
Terminal strip
2
Open button
3
Close button
1
4
Potentiometer
1
5
Jumper strip
6
Jumper
(deadman/push button)
1 do not adjust
46
GB
Electrical connection and all work on the electronics must be
performed by a specialist service company. If you have any
questions, please contact the manufacturer.
Terminal diagram, 230 V power supply
Underneath the electronics there is a ring transformer. At the trans-
former's underside, a blue and a brown cable are attached. Connect
these cables to 230 V AC mains. The polarity does not matter. The
230V cable and the 24V cable have to be installed separately.
Terminal strip
The terminals on the controller's orange terminal strip are sequen-
tially numbered from 1 to 6. Connect the 24 volt motor to terminals
1 and 2. The polarity determines the motor's direction of rotation.
Terminal 3 is a neutral conductor and terminal 4 provides 24 V for
auxiliary devices.
A floating contact can be connected through terminals 3, 5 and 6.
Slow operation
The sliding system learns the travelled distance during its test cycle.
It then slows the leaf down just before it reaches its end position.
For further details, see the commissioning steps below.
Commissioning
1. Make connections as described above.
2. Disconnect and reconnect the deadman jumper (6). This resets
the controller. The set parameters are retained even when the con-
troller is disconnected from mains power.
3. Perform a teach-in operation. During the first run, the shutters
must be able to travel freely (i.e. not start from an end position) and
arrive correctly at an end stop. Move the shutter to a position about
half-way between the stops, perform a reset (see step 2) and start
the teach-in operations by pushing the buttons (2) or (3).
After each reset, the controller automatically learns the path of
travel and the breaking current. Carry out at least five full door op-
erations. No further steps are necessary. Do not make any changes
to the controller and do not connect third-party devices without prior
consultation with the manufacturer.