Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Hardware Requirements / Minimum System Requirements For Installation Of The; Big 10; Scope Of Delivery - Elcon ELCONNECT next BIG 10 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für ELCONNECT next BIG 10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2 Installation

2.1

Hardware requirements / Minimum system requirements for installation of the

BIG 10

• Power socket providing nominal voltage range 100 V ... 240 V
• Laptop or PC running on OS Windows
full-duplex network interface card (interface: 10/100Base-T); CPU: Pentium II
500 MHz or higher
• if necessary: diverse tools for wall-mounting (water-level, pencil, drilling machine,
drill Ø 6 mm, screwdriver)
2.2

Scope of delivery

• 1 BIG 10 Router with external plug-in power supply unit 12 V
o Order no. 900216: BIG 1022 (2-port SHDSL)
o Order no. 900217: BIG 1024 (4-port SHDSL)
o Order no. 900220: BIG 1044 (4-port SHDSL / WLAN)
• 1 plug-in power supply unit (12 V
• 1 Ethernet cable, yellow, 3 m
• 1 drilling template
• 1 toolkit bag (2 dowels, 2 screws)
• 1 operating manual
2.3

Selecting the place of installation / Fixing the device

The BIG 10 has been designed for in-house use in closed rooms. It may be operated as desk-
top unit or fixed to the wall. The BIG 10 should be placed nearby the DSL cable and next to a
mains socket. Since the BIG 10 is determined for continuous operation, it has no mains
switch. For disconnection from the electricity grid, just remove the plug-in power supply unit.
So the wall power supply should always be easily accessible.
Prior to wall mounting, make sure that there are no concealed supply lines (power, water, gas,
telephone, coaxial or fiber cable) at the intended installation place. During operation, the
BIG 10 is markedly warming up, but this operating temperature is not dangerous at all. How-
ever, to provide for unimpeded heat dissipation, the BIG 10 must not be installed into a fully
closed casing, lacking of a sufficiently dimensioned breather hole. For the same reason the
device shall also be protected from intensive heating, caused e.g. by heating appliances or
direct sun radiation. Further, do not expose the modem to a very humid or dusty environment.
The mounting instructions can be found on the drilling template.
38
®
98 SE, ME, 2000, XP; MAC; Linux and
, 1.2 A)
BIG 10 Router
/ 50 Hz ... 60 Hz
®
,
, 1.2 A
Version: 2011/01/19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis