Herunterladen Inhalt Inhalt Diese Seite drucken

Siemens RVL481 Installationsanleitung Seite 47

Vorschau ausblenden Andere Handbücher für RVL481:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
10
Third heating pe-
riod, end of
NORMAL heating
11
Holiday period
12
Date of first day of
holiday
13
Date of last day of
holiday
14
Heating curve, flow
setpoint at 15 °C
outside temperature
15
Heating curve, flow
setpoint at –5 °C
outside temperature
26
Setpoint d.h.w.
temperature
NORMAL
27
D.h.w. temperature
28
Setpoint d.h.w.
temperature
REDUCED
31
Weekday (for swi t -
ching program 2)
32
Start of first ON
period
Building Technologies
--:--
(00:00...24:00)
........................
.
-
(1...8)
.......................
.
--.--
(01.01 ... 31.12)
.......................
.
--.--
(01.01 ... 31.12)
.......................
.
30 °C
(20...70)
..................
60 °C
(20...120)
..................
55 °C
(20...100)
..................
Display function
40 °C
(8...80)
..................
1-7
(1...7)
........................
.
05:00
(00:00...24:00)
........................
74 319 0618 0 a
Day.Month
Day.Month
These operating lines are ac-
°C
tive only if digital adjustment of
the heating curve has been
selected (refer to entry made
°C
on operating line 73)
°C
With plant types x–0 and x–5,
these operating lines do not
appear
°C
1 = Monday
2 = Tuesday, etc.
1-7 = entire week
Switching program 2
--:-- = period inactive
17.04.2008
en
47/326

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis