Herunterladen Inhalt Inhalt Diese Seite drucken

Left Side; Right Side; Rear Side - Mitsubishi Electric CITY MULTI PAC-PH01EHY-E Installationshandbuch

Inhaltsverzeichnis

Werbung

6
[Fig. 6.0.10]
<A> Make sure that no undue force is applied to the wirings from which cable straps were removed. Attach the bottom
attachment that was removed from the fin guard, and then hook the main control box on the attachment.
A Bottom attachment
B Main control box
[Fig. 6.0.11]
<A>
A

Left side

[Fig. 6.0.12]

Rear side

4
6.0
<A>
B

Right side

<A>
<A> Unscrew the two screws on the rear panel.
A
A Rear panel
A
A
B
B
<A> Unscrew the two screws each on the right and left
panels.
A Left panel
B Right panel

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pac-ph02ehy-eCity multi pac-ph03ehy-e

Inhaltsverzeichnis