Herunterladen Inhalt Inhalt Diese Seite drucken

Power Cable; Preparing For Installation; Water Connection; Appliance Installation - STIEBEL ELTRON SHZ 80 LCD Bedienung Und Installation

Vorschau ausblenden Andere Handbücher für SHZ 80 LCD:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

Preparing for installation

9.3

Power cable

20
10. Preparing for installation

10.1 Water connection

Note
Carry out all water connection and installation work in
accordance with regulations.
Sealed unvented (pressure-tested) for supplying several draw-
off points
f Fit the safety assembly in the cold water supply line. Be sure
to choose the appropriate safety assembly, according to the
static pressure.
f Observe the information in the safety assembly installation
instructions.
Open (unpressurised) for the supply of one draw-off point
Note
Never shut off the outlet and pivoting spout.
Do not use an aerator.
f Flush thoroughly.
f Use the open vented taps that we recommend.

10.2 Appliance installation

www.stiebel-eltron.com
2 0

10.3 Power supply

WARNING Electrocution
Carry out all electrical connection and installation work
in accordance with relevant regulations.
WARNING Electrocution
The connection to the power supply is only permissi-
ble as a permanent connection in conjunction with the
removable cable grommet. The appliance must be able
to be separated from the power supply by an isolator
that disconnects all poles with at least 3 mm contact
separation.
Material damage
!
Ensure that the appliance is earthed.
5
1 Electronic assembly, control unit
2 Operating mode switch
3 Output switch
4 Electronic assembly, operation
5 Connecting cable, electronic assemblies
f Undo the 4 screws.
f Remove the bottom cap.
f Pull out the cable grommet at the base while pressing the
snap-in tabs.
f Push the cable grommet over the connecting cable and snap
the cable grommet back in place.
1
2
3
4
SHZ LCD |
33

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis