Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation - oventrop Unibox RLA Einbau- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Instructions regarding heating up see docu-
ments of the surface heating manufacturer.
Notes regarding the initial operation of the
mounted "Unibox (T / E T / RTL / E RTL / plus
/ E plus / vario / E vario / und E BV)" see
enclosed installation instructions.
Further instructions of the screed
manufacturer are to be observed.

5.6 Initial operation

The flow temperature must be adapt-
ed to the surface heating system.
The maximum permissible screed tempera-
ture according to DIN near the heating pipes
must not be exceeded. The general instruc-
tions of the manufacturer are valid.
After having completed all building work, the
protection cover is removed and the white
cover is mounted and adjusted.
For further information see technical
information "Unibox E" and "Unibox".
Installation and operating instructions
6. Operation
6.1 Isolation of the valve
Remove the cap of the isolating valve. Close
the valve stem by turning it clockwise with an
Allen key (size 6).
Valve stem
Illustr. 6.1 Isolating valve
"Unibox RLA"
Cap
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis