Grease layer thickness measuring device Multi Control
Checklist for commissioning (properly qualified technician)
Tests & Inspections
(no claim is made that the list is complete)
Electrical fusing of the plant in accordance with the IEC regulations or national and local
regulations
Operating voltage and frequency
Correct installation
Height adjustment of the measuring rod
Adjustment on the evaluation device
Displayed on the evaluation device
Functional test
Tightness: Connections or implementation
Fault signalling equipment: Fault displays, telecommunication equipment (group alarm)
Instruction (by installer company)
Instruction
Remarks
Functions, evaluation device, operating information,
Instruction:
troubleshooting, maintenance obligations
Handover:
Instructions for Use
Remarks:
technician:
Signature of authorised acceptance
inspection representative:
Appendix: Commissioning report
not
OK
OK
yes
no
71/ 72