Herunterladen Inhalt Inhalt Diese Seite drucken

Pelgrim IDK 660 Anleitung Seite 99

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

installation dimensions
21
Above a 60 cm Pelgrim oven
Ventilation occurs through the plinth and back of
the oven. The niche should be at least 600 mm
high.
Make an opening of at least 560 x 6 mm at the
front and back.
Installation of the induction hob above a
combi-microwave, a microwave, a 90 cm
Pelgrim oven or any other brand of oven.
Saw the ventilation openings in such a way that
the total surface area of the holes is at least 100
cm2. E.g. two holes of 50 cm2.
Fit a shield between the oven and the hob. This
shield should be at least 10 mm thick and heat
resistant (85 °C).
The space between the underside of the hob and
the shield should be at least 50 mm.
To protect the airflow, fit a protective panel of the
same material as the shield between the shield and
the hob. Ventilation occurs through the adjacent
cupboards.

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis