Herunterladen Inhalt Inhalt Diese Seite drucken

Putting Into Operation; Transport And Installation En - Abicor Binzel FES-200 W3 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für FES-200 W3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6 Putting into operation

6 Putting into operation
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Disconnect the mains plug.
NOTICE
• The fume extraction system must be mounted on a plane surface near the work area.
4
1
Fume extraction system FES-200 W3
2
Extraction hose (cable assembly)
Fig. 7
Putting into operation
1 Connect the torch system (4), hose and rubber connector to the fume extraction system.
NOTICE
• When fixing the start-stop pliers (3), make sure that the red point points to the torch system.
2 Connect the start-stop pliers (3) to the fume extraction system (1) and then attach them securely to the
extraction hose (2) (cable assembly) of the torch system (4). (Optional)
3 Connect the dedusting system to the compressed air.
4 Plug in the mains plug.
6.1 Transport and installation
Select a location that allows a short and straight extraction hose feed and prevents it from entering the
employee's space of movement.
EN - 18
DANGER
3
Start-stop pliers, 4-pole (may differ from shown)
FES-200 W3
1
2
3
4
Torch system

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis