5
Commissioning
5.1
Important notes
WARNING!
Incorrect settings during commissioning may cause unexpected and dangerous motor and system
movements.
Possible consequence: death, severe injuries or damage to property
▶
Clear hazardous area.
▶
Observe safety instructions and safety clearances.
5.2
Before initial switch-on
Prevent injury to persons and damage to property. Check the following before switching on the mains
voltage:
• Is the wiring complete and correct?
• Are there no short circuits and earth faults?
• Is the motor circuit configuration (star/delta) adapted to the output voltage of the inverter?
• Is the motor connected in-phase (direction of rotation)?
• Does the "emergency stop" function of the entire plant operate correctly?
Commissioning
Important notes
5
27