Herunterladen Inhalt Inhalt Diese Seite drucken

Power Connections And Startup - Eaton 9910-E15 Installationshandbuch Für Imb-Anwendungen

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 92
INSTALLATION

Power Connections and Startup

14
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
See "UPS Rear Panels" on page 17 for REPO location. Figure 4 shows a
schematic of the REPO connector contacts.
1
2
You can set the REPO polarity. See the "REPO Input Polarity" setting in
"User Settings" in the UPS user's guide.
NOTE Depending on user configuration, the pins must be shorted or open to keep the UPS
running. To restart the UPS, reconnect (re-open) the REPO connector pins and turn on the UPS
manually. Maximum resistance in the shorted loop is 10 ohm.
NOTE Always test the REPO function before applying your critical load to avoid accidental
load loss.
To start up the UPS:
1.
If optional
s are installed, verify that the
EBM
the UPS (see page 11
2.
Verify that the internal bateries are connected (see page 10).
3.
Plug the equipment to be protected into the UPS, but do not turn
on the protected equipment.
4.
Make any necessary provisions for cord retention and strain relief.
NOTE DO NOT protect laser printers with the UPS because of the exceptionally high power
requirements of the heating elements.
5.
E16 models only. Plug the power cord provided with the IBM
equipment into the input connector on the UPS rear panel (see
Figure 6 and Figure 5 on page 17).
6.
Plug the UPS power cord into a power outlet.
The UPS front panel display illuminates and shows a status of "UPS
initializing..."
7.
Verify that the UPS transfers to Standby mode ("UPS on standby").
+ Polarity
– Polarity
Figure 4. REPO Connections
).
S
®
Applications
164201783 Rev 2
REPO
s are connected to
EBM

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

91309910-e16

Inhaltsverzeichnis