Herunterladen Inhalt Inhalt Diese Seite drucken

Operating Environment - HACH LANGE AMTAX inter2 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 63
Solid-containing samples must be pre-treated prior to entry into the
process device:
For the activated sludge tank and post-sewage treatment area,
FILTRAX is recommended
For the pre-sewage treatment and feed area, ultrafiltration or similar
procedures have proven themselves
Installation

Operating environment

N O T I C E
Protect the device against extreme temperatures from heaters, direct sunlight and
other heat sources.
N O T I C E
The device has been designed exclusively for wall installation.
C A U T I O N
Note the weight (approx. 50 kg) of the instrument. Do not try to carry the instru-
ment without help.
Use only suitable lifting devices for the transport.
Select a suitable place for installation of the instrument. Plan the
mechanical installation before the application of supports or the drilling
of holes.
Make sure that the hardware can support sufficient weight. The wall
plugs selected must be suitable for the wall composition and also be
approved for this.
Plan the cable and lead routing in order to avoid sharp bends and
tripping hazards.
English 98
Figure 2 Drilling and installation instructions
527
min. + 5° C
max. +40° C
420
Hole spacing
N O T I C E
Each process device should have a separate drain hose! The individual device
drains may only be combined in a larger drain pipe with regular water throughput.
352
200
527
150
300
Hole spacing
420
Hole spacing

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis